DesignOhio Monday 04.08.24 @ 11:30 AM - Barrier Management for Compliance in Healthcare Facilities - 1 LU/HSU

 

April 08, 2024
11:30 AM - 1:00 PM
Add to Calendar

 

Columbus Main Library
96 S. Grant Ave
Columbus, OH 43215
Directions

Please join us for our next DesignOhio meeting!  And please check out our website at https://designohio.org/

We will be meeting in room 2B at the Main Library. There is a parking garage on the north side of the building. The 1st hour of parking is free and there is a minimal charge each hour thereafter. Bring your parking ticket inside to pay when you leave. Lunch will be catered!  So that we can get a proper headcount for food please choose the appropriate "In-Person" or "Online" ticket.  For those attending online the link can be copied and pasted into your browser:

https://us02web.zoom.us/j/83460878996

Meeting ID: 834 6087 8996

Contact Adam Olson at [email protected] or 614-507-0023 with any questions.  

Course Description:

 An important criterion for a first-class property environment is the establishment of risk management and loss prevention programs to assure the reliability of fire and life safety systems.  Barrier management programs are one such risk management practice that entails identifying all types of fire rated assemblies including the types of penetrations, and the activities that cause them to become breached. This program is intended to provide a road map of best practices that can be utilized to assist with commissioning of a new project to the maintaining of these barriers post construction. These practices will provide the tools needed to achieve compliance. The goal of any barrier management program is to prepare and mitigate possible issues through detection and suppression of potential future loss from fire. The program does this by setting expectations for all parties involved including designers, vendors, contractors, and facility maintenance personnel to maintain a specific set of Firestop Systems for installation and inspection of assemblies during the construction phase and the managing of the facility post construction to have a better understanding when situations of non-compliance might arise.

Learning Objectives:

• Recognize the importance of a preconstruction risk assessment and the IBC special inspection for firestopping requirement prior to construction.
• Discuss the process used to ensure fire and smoke rated barrier compliance during safety inspection commissioning.
• Differentiate between common fire protection and life safety code sections in the IBC (Division 7) and NFPA 101.
• Discuss procedures that can be implemented to assist with fire and smoke barrier compliance during the preconstruction stage.
• Summarize what a solid Standard Operating Practice (SOP) for passive fire protection should consist of.
• Identify tools, best practices and procedures to achieve life safety code compliance in fire, smoke, and acoustical assemblies during all phases of the buildings life cycle.

 Speaker:

Michael Crall

See attachment for Michael's Bio.